Got to work on the removals this weekend (very hot) in the shop. I only had to grind off two bolts and (wahlah) frame exposed. The resulting repairs needed for the body repair is what is expected.
bed riser
both rear tail light panels
rear cross member (Under the tailgate)
Hat channel
driver and passenger floors
rear passenger quarter panel
I will most likely get replacement panels for the body and weld it back, lots of stress cracks everywhere, I do have a 2a tub for those areas that are useable.
as far as the frame it looks like the frame horns are the only area that needs attention besides the dirt and grease. I'll have the motor and drive train pulled this weekend.
Bubba did his part on this one. the brakes were interesting to see how he engineered the peddles from the master cylinder (hang down from the cowl and not up from the floor).
Here are some pics for the pennut gallery (which I am a member) but its kind of interesting to go back through the thread and see the progress or lack of and how long it takes.
My plan is to get the rolling chassis completed by the next two months. Axels, springs, frame, brakes, ect. I have most of the parts for that unless the surprises are overwhelming.
The body turned out to be more damaged than I expected, so I will cut out the bad and order and replace with good. I am disappointed with the fenders, I thought I might be able to save them but my skills will butcher them. to many bad spots and bubba mods.
Chime in and give me your opinions and guidance as this project moves to the I'm done and whats next phase (down the road).