More installation issues sorted, engine bay and under dash electrics sorted, all wiring for the old engine was on the opposite side to the F-134. New ally radiator arrived - it was a 3 core unit for a MB, so I had to make a support to go under it and a brace back to the firewall. Cranked engine over without plugs to get oil circulating, installed plugs and it fired right up. Carb needs an overhaul as a bit of sputtering happening. I'll wait to finish the air cleaner install and see if that makes a difference. All front panels now back in place, had to make up a new shroud between the grille and the radiator as what I had was modified to suit the previous engine. I was surprised how much the gearbox moved when I removed the other engine, seems the people who originally changed the engine must have levered the engine/gearbox assembly about one inch towards the back of the Jeep - pulling that engine allowed everything to de-stress and return to normal, so that was a bonus.
What's left to do is refit the floor panel over the gearbox and refit the shift lever boots, a bit of messing around to make it all fit right now things are more where they should be. And the exhaust, I got a new header pipe made up from the exhaust manifold and it currently ends about level with the back of the gas tank. I need to make up a new pipe to go from there, across the back axle then turn 90 degrees so I can fit a muffler in there somewhere. My aim is to have it on the road around mid year, so on track to get there.