Found the tiny little holes in the rods, so that's all good, rods had been installed correctly, further investigation on the pistons showed they can go in either way around. New rings are due to arrive today, cylinder head studs ordered to replace the head bolts, due in about another 8 days, gaskets have arrived, oil pickup float cleaned and repaired so it will float - it had a small hole drilled in and was full of old oil, so it sat in the gunk in the bottom of the pan. All parts cleaned, painted and repaired where needed, all replacement correct size bolts, nuts and studs sourced, now ready to start assembly.