The CJ3A Page CJ3B.info

Author Topic: PICTURES:  rebuild status & Rust question  (Read 2869 times)

0 Members and 1 Guest are viewing this topic.

Offline Shalka04

  • Willys Fan
  • **
  • Posts: 51
  • Karma: +0/-0
  • Still Plays With Jeeps
    • View Profile
PICTURES:  rebuild status & Rust question
« on: May 15, 2012, 11:04:14 PM »
It's been just a month now since we towed it out of the hills. �I've broken it down, shot pictures of and labeled everything i could think of twice over.
last monday parts started to come back from the sandblaster:

New Brake lines, etc.

I've taken to replacing almost every fastener with new grade 8 stuff, if for no other reason then because I like the why their yellow color stands uot against the black frame. �After everything is in place and tightened up i've been going back and hitting each fastener with a bit of satin clear coat.

Now for the rust question:
Under the drivers seat is the worst but speaking as the primary driver, i'm not to happy about the metal that would be under my butt either.
Would full on floor panels from a place like Walcks be over kill? �I'm wondering if i don't just need to address areas that would be about the size of a cookie sheet. �Any thoughts or pictures of how you did yours.

Thanks, �-John


Offline Comanche_County

  • Willys Guru
  • ****
  • Posts: 252
  • Karma: +0/-0
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #1 on: May 15, 2012, 11:13:54 PM »
Wow, that tub looks really good.  I'd give it a good wire wheeling and if no large holes are exposed then I think you'd be fine.  How's the hat channel look underneath?
Georgia President of the International Flat Fender Club

Offline Shalka04

  • Willys Fan
  • **
  • Posts: 51
  • Karma: +0/-0
  • Still Plays With Jeeps
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #2 on: May 15, 2012, 11:49:46 PM »
Quote
Wow, that tub looks really good. �I'd give it a good wire wheeling and if no large holes are exposed then I think you'd be fine. �How's the hat channel look underneath?
From what I remember the Hat Channels were fine, but it's been a few weeks since I looked. �I'll gut the tub up on some blocks so I can look and take pics, so we'll all know soon enough.
I'll wire wheel the drivers side and keep my fingers crossed, but thanks to photoshop I've zoomed in on the passanger side are inside the tool box. �The red arrows point to small holes and rips in the metal, so it's got to be to thin to not worry about.

Offline CJPilot

  • Flatfender Enthusiast
  • ***
  • Posts: 177
  • Karma: +0/-0
  • Shade Tree Mechanic
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #3 on: May 16, 2012, 08:35:21 AM »
John - �That is a great looking frame and tub. If I were in your shoes I�d buy new panels for the rusted areas and only use the sections of the new panel in the areas of �bad rust. �Not replacing the whole panel my give you a nicer finished tub, But it�s might be more work.

http://www.classicent.com


Steve

1950 CJ3A

Offline F Bill

  • Flatfender Master
  • *****
  • Posts: 1402
  • Karma: +1/-0
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #4 on: May 16, 2012, 09:07:41 AM »
I don't suggest this sort of repair often....but to keep the original floor intact as much as possible I would consider cleaning the rust off as much as you can and fiberglassing the holes from both sides. Or use that silverseal paint someone mentioned a while back. I may have the name wrong. EDIT ..As seen below, it is Mastercoat Silver... good stuff.
Maybe even use a POR product.
Piecing in good metal is not for the faint of heart....and it is tough to get it not to show. If your metal is structurally sound with only cosmetic rust the coverup type of repair may be worth considering. It appears you have some minor perforation and not enough to seriously weaken the metal in your pictures.

If the hat channels need replacing, then I would go ahead and replace panels or partial panels with flat steel, butt welding as neatly as possible. Do not overlap your new steel on top of the old panel as is so common on farmer repairs....as it can't be hidden and adds one more place to rust in the future.

 To repair toolbox rot you normally have to drill out all the spot welds holding the toolbox to the floor, repair the floor, and reweld the toolbox back to the tub. I doubt it would be worth replacing the floor with Classic's floors as you would only use about a third of their panel by the looks of it. The floor is mostly flat, and easy to fabricate pieces if you do not need to go into the tunnel area with your patches. There is a lip along the tub wall, if you need to cut out rust anywhere near it, just cut the lip too and avoid another butt weld in that area. The floor is spot welded to the tub side. Spot welds can be replaced by rosette or plug welding thru a small hole in one panel.

If you do not have the skill to butt weld in a patch that won't show with the welds ground down, practice first on scrap metal until you do. The key to a good patch is good fit and hammering the weld area with a dolly behind to stretch out the shrinkage that comes with welding. It is easier to planish an oxyacetylene weld, but harder for most �to do the actual weld. They do make a softer wire for the mig designed for bodywork and easier shaping, dunno where to get it right now without searching the net.. If you do mig, the usual advice is to weld a spot, move as far away from that spot as you can and weld another, never letting the metal build up a lot of heat. Keep skipping around until you have filled the entire area with weld.
SOme wait to grind until th eend, others like to grind each weld flat as they go.
« Last Edit: May 16, 2012, 12:30:05 PM by F_Bill »
Owner of the world famous?? Pintojeep 3A and one yet to be named stock project 3A.
Based in central TX and upstate NY.

Offline athawk11

  • SMF Administrator
  • Flatfender Master
  • *****
  • Posts: 2818
  • Karma: +0/-1
  • 1949 CJ3A
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #5 on: May 16, 2012, 10:17:46 AM »
Your frame is looking real nice. �

On the floor pans....tough call. � As others have suggested, If you have the skill set, or wish to learn it, full or partial pan replacement would be the best approach. �

Your pans don't look bad. �I agree with Bill, that there are approaches that are far less invasive. �The silver paint he was suggesting is call Mastercoat Silver. �I used it. �It's nice stuff. �With it, you don't need to get every bit of rust off the pans. �With multiple coats, it will also build up the strength of the pans. �Here is a link:

http://www.masterseriescoatings.com/index/primer/

I also agree with the others on the hat channels. �If they are shot, replace the pans. �If they are in good condition, patch the floors.
I initally planned on keeping my floors, but when I really got into it, there was no saving them.






2-1949 CJ3As
1-1946 CJ2A

Offline calvinhunt

  • Flatfender Master
  • *****
  • Posts: 1000
  • Karma: +0/-0
  • Let's keep these great American icons alive!
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #6 on: May 17, 2012, 01:08:06 AM »
Very enviable results.  Some are really talented. Some of the rest of us just have to wish for such abilities and equipment.  
Calvin
Santa Clara, Utah

Offline athawk11

  • SMF Administrator
  • Flatfender Master
  • *****
  • Posts: 2818
  • Karma: +0/-1
  • 1949 CJ3A
    • View Profile
Re: PICTURES: �rebuild status & Rust question
« Reply #7 on: May 18, 2012, 08:05:26 PM »
Calvin,

You're very kind.  I had never done anything like this before.  It was a classic 'learn on the job' experience.  And honestly, I hate to admit that I screwed up plenty.  Every time I messed up and had to fix it, I learned a little more.

Bottom line is I just couldn't afford a new tub, but could afford the hours it would take to save this one.  Estimated time it took to cut out bad, weld in good, grind, hammer/dolly, metal shrinking:  270 to 300 hours.  If I knew at the start what I know now, it would have probably taken 80 to 100 hours.  

Tim
2-1949 CJ3As
1-1946 CJ2A