Here is attachment to the tub. It was buggered pretty badly so when I got my tailgate surround I put in a little bit of angle iron to support and stiffen the metal. I am at some point going to build the tailgate extension box and wanted a little more beef to attach it to so why not use it for the rack. it is 3/4" square tubing and I offset it with a spacer to get it over the angle and put on the little stop piece so it would stay parallel with the tailgate


Here is some flat stock welded to frame and it rests in the opening where the tailgate hinge is. It keeps it plumb to gate and no big deal with paint scratching since it will get scratched opening the tailgate anyway

That established the bottom and it doesn't matter if the top sits up a bit as the bows on the CJ's are fixed so folding them back like military bows isn't a concern. I also got 3' pieces of angle so 2 pieces 3' and 1 piece cut to 18" I had no waste.

Here is the tubing closed off to keep water out and I drilled a hole through it and the angle on the tub


I was able to paint it with automotive primer and paint same time as doing my body. I debated on keeping it same color as body or black for contrast but decided same color looked better

Here it is painted and I drilled and tapped the angle on the tub 10/32 thread and ran brass screws down through the tubing and into the angle to keep it secure. It can't bounce or slide this way as it is flat on flat

Loaded up just had to figure out how to keep it a little more secure from thievery
