I now have reached the point where I have the engine minus the radiator and driveline on the frame. I wasn't really planning on doing much with the frame, but it is in great shape and probably should be given proper treatment of POR15 or something similar to be decided at a later date.
My work space has a large overhead crane equipped with a big hook. I am seeking suggestions as to how to use this crane to remove the engine and driveline. I have looked at threads on this site and the CJ2A site that show various methods of taking out the engine and driveline, but none use a crane with a hook.� So, here are my questions:
Could I use straps to lift the engine and driveline out as a single unit? If so, where would I run the straps? If I were to take this approach, how would you suggest I rest the unit on the floor after removal. I don't think that the oil pan would appreciate being the resting point.
If removing everything at once is a bad idea, then what is the easiest point to separate the driveline from the engine: at the engine bell housing junction or at the bell housing transmission junction?
Thanks.
Steve