12
« on: August 19, 2017, 03:05:19 PM »
I posted this on the CJ2A site and it was immediately removed. I was going to copy/paste but I wasn't fast enough. I guess they don't want anything about CJ3A Jeeps on their site.
The tub on my Jeep was sinking down around the frame mounts and parts of the body were rusted away so it was time to replace it. In April my son and I drove to Walcks to pick up a tub kit and other parts. I spent a lot of time with Carl and I enjoyed the visit. He is a real nice person.
They have an unbelievable bunch of used parts stashed around their property. If you need a hard to find part call Carl, he may have it.
The tub fit the frame ok, by that I mean with the fenders temporally bolted on with a few bolts we were able to get the frame mount bolt holes lined up reasonably close to drill them into the top hats. The tub is not really centered on the frame but I don't think any of them are.
The shift lever fit reasonably close in the hole but the low/high lever hole had to be enlarged quite a bit for it to shift to low range. The fuel tank hole had to be opened up at the top so the neck would fit into the tub. I had to cut away some of the neck grommet to make it fit also. The holes in the floor for the fuel tank drain and fuel line had to be enlarged.
when I installed the fenders I had to do a lot of forcing to get the bolt holes lined up. When I tried the new windshield frame on the new tub the mounting arms were to wide to fit the cowl contour and pivot points. i used the old windshield frame and it fit fine.
The hood and tailgate fit ok. I used my old grill and everything lined up after some adjustment. There were some other issues but I don't remember all of them.
The floor of the tub is rubbing on something under neath. I dropped the rear tranny cross member 1/2" and it stopped squeaking for a while but it's doing it again now.
I took it on some creek crossings and rough gravel roads here to be sure everything is ok. So far all I have a problem with is the squeaks.
I painted it WWII Olive Drab again because I like it and it's hard to see in the woods and on the Utah desert among the Sage Brush and shrubs.
If you replace your tub with a MD Juan expect a lot of work fitting things up. I painted the tub and other parts before putting it together and touched it up when done. I didn't want to put it together, take it apart, paint it and put it together again. It took 4 months working on it about 4 to 6 hours a day, weekends included. That was from tear down to drive away A few days were spent on other jobs that came up.
I believe my tub kit was made in the last part of 2016. I don't think it's older than that because the importer in Georgia had just got a recent shipment of the complete tub kits in when Carl ordered my kit from them.